After much progress on the first day of framing (Friday), it would appear to have slowed down a bit, but progress has still been substantial. In the photos below, you will notice that all of the roof structure is now completed, and the plywood decking is now partially completed. They have also completed all the trim work around the eves, and also installed all the windows and doors (except for the 2 windows in the dormers on the front of the house).
You will also notice that the jungle gym of random boards has been removed from the garage and other areas of the house has been removed, and the house is now standing on its own 2 feet (or however many feet a house has).
Windows and door and plywood - oh my!
Note to mother Carol - the back porch would be on the left in this picture (notice the back door). The 4 windows in the center are the back of the living room, windows on the right are the master bedroom.
View from the kitchen into the living room. The frame for the fireplace has now been completed. To the right will be the "breakfast nook", and out through the door is the back porch. Where the conduit (hollow metal pipe thingy) is sticking out of the floor at the bottom of the photo is where the kitchen island/eating bar will be.
No comments:
Post a Comment